Proudly serving our National Parks Service

Silver Lake Dock repair - $192k

 

Silver Lake Dock was damaged by Hurricane Dorian. The electrical system and plumbing system on the marine pedestals were damaged by flood water. Achuti was contracted to replace the damaged pedestals. Boats planning to dock at Sliver Lake now have reliable shore power and fresh water.

IMG-6825.jpg
Previous
Previous

Seymour Johnson AFB Facility Demolition

Next
Next

Blue Ridge Parkway Highway - Road Striping